What Are the Testing Methods for Integrated Pump Stations?
Commissioning and testing methods for integrated pump stations and integrated prefabricated pump stations, which are lifting equipment for sewage, stormwater, drinking water and wastewater
1. Whether setup and installation are correct;
2. For pipes where a vacuum may form, the vacuum breaker valve should have sufficient flow area and operate accurately and reliably;
3. The valves on the inlet and outlet pipes should be open, and other devices should be in normal working condition.
Design and Construction Methods for Integrated Pump Stations
1. Meet the requirements for layout, installation, operation and maintenance of electromechanical equipment;
2. Meet structural layout requirements;
3. Meet ventilation, heating and lighting requirements;
4. Meet transport requirements;
5. Make the layout attractive and in harmony with the surrounding environment.
1. There should be an excavation plan for the pump pit, and excavation must strictly follow it.
2. The excavation cross-section must meet the requirements of pit design, construction and slope stability.
3. Dewatering measures should be taken at the bottom of the pump pit.
4. Use suitable pit support methods to prevent the pump pit from collapsing.
How to commission an integrated pump station? Integrated prefabricated pump stations are lifting equipment for sewage, stormwater, drinking water and wastewater
1. Whether setup and installation are correct;
2. For pipes where a vacuum may form, the vacuum breaker valve should have sufficient flow area and operate accurately and reliably;
3. The valves on the inlet and outlet pipes should be open, and other devices should be in normal working condition.