Construction of Urban Sewage Lift Pump Stations
Construction of Urban Sewage Lift Pump Stations
1. Overview
The integrated sewage lift pump station is an important part of the sewage treatment system and has two main uses. Unlike water supply pipes, sewers have no pressure to drive the flow and rely on gravity alone. Urban interceptor networks collect sewage over a wide area some distance from the treatment plant, and given cost, construction time and difficulty, pipes cannot be buried very deep. In this case an integrated sewage pump station is installed to provide pressure and raise the sewage level. For this purpose, the integrated sewage lift pump station is installed in the sewer system to lift urban sewage and raise its level. The other use is inside the sewage treatment plant, where it raises the sewage level to provide the flow driving force for subsequent processes.
2. Performance and Advantages of Integrated Pump Stations:
1. Continuous, efficient operation
2. Turnkey integrated solution
3. Saves 2/3 of the footprint
4. High-strength filament-wound GRP shaft
5. Self-cleaning pump pit floor designed with CFD simulation
When it comes to pump stations, everyone probably knows their function and principle, but the price of integrated prefabricated pump stations remains a subject of much debate. Customers often ask how much an integrated prefabricated pump station costs. An integrated prefabricated pump station is a custom product made to customer requirements, unlike other products manufactured in batches to fixed specifications and sold as finished goods. Construction of urban sewage lift pump stations
3. Product Introduction
1. In municipal applications, for low-lying areas such as underpasses that are prone to waterlogging, sewage lifters reduce environmental damage and avoid economic and unnecessary losses.
2. Ensuring rainwater discharge is also an important function of sewage lift pumps: using potential and pressure energy, they raise the level of rainwater flowing into the station and then pump it under pressure, ensuring timely discharge without silting up and blocking the pipes.
3. Submersible sewage pumps with effective discharge capacity provide efficient spiral mixing to remove sludge, particles and other impurities, keeping pipes clear and odor-free. Note that different types of sewage lift pump differ in function. One type is installed in the sewer system to lift urban sewage, raising its level; the other is installed inside the treatment plant to lift sewage, providing the flow driving force for subsequent processes.
One point to emphasize in particular is that old sewage lift pumps take up a lot of space and are inefficient, so they are long out of date and their replacement is inevitable. Toilet sewage lifting equipment is suitable for places with relatively small sewage volumes, such as homes and villas; it lifts sewage effectively without taking up space, so of course it has a better market.
4. Installation Considerations
1. The site should be at a lower point in the drainage area, suited to natural flow convergence. Make full use of the existing drainage system to reduce canal earthworks and land use, but when using existing canals, consider how future canal adjustments may affect the station. The site should be as close as possible to the receiving water body to shorten the discharge channel.
2. The site should be where the outer river level is lower (i.e. downstream on the outer river), to reduce the discharge head, installed capacity and power consumption.
3. The site should be on a straight river section with a stable bed and little scouring or silting, or on the concave bank of a bend. There should be a certain foreshore width to accommodate cofferdams and material yards, but not too wide, to avoid an overly long drainage channel. As far as possible, meet the requirements for frontal intake and frontal discharge.
4. Fully consider gravity drainage conditions and combine gravity drainage with pumped drainage wherever possible.
5. Pay attention to multipurpose use and combine long-term and short-term plans. If there are irrigation requirements, consider the elevation and layout of the irrigation intake and canal head, combining drainage and irrigation where possible to improve equipment utilization and expand project benefits.
6. The site should have good geological conditions, avoiding soft silt and fine silty sand strata as far as possible, and avoiding abandoned river channels, ponds, deep ditches and other places prone to silting.