The Self-Cleaning Process of Prefabricated Pump Stations

When the pumps of a prefabricated pump station start, a pre-set control program opens the electric valve on the side branch, and part of the pressure in the main discharge pipe flows through the branch. Because the pipe is narrow, the pressurized water becomes a high-velocity jet that scours the areas inside the shaft where deposits tend to build up, so impurities deposited inside the station are carried out with the flow and discharged. This is how a prefabricated pump station operates.
The opening, closing and interval of the electric valve can be adjusted intelligently in the control system. During dry periods, the liquid level falls to the set low level and, because no flow enters the station, does not rise to the normal pump start level.
Long periods with the pumps stopped cause impurities in the sewage inside the shaft to gradually settle and adhere, and even cake after the water evaporates. As a result, when the station restarts, the deposits cannot be discharged at all.

Back

Product Categories

Contact Us

Address: Liujin Road, Sitaizi Industrial Park, Bayuquan District, Yingkou, Liaoning, China

Contact: Mr. Li Chuanyi +86 138 4076 5457

Technical Service: Mr. Song (Engineer) +86 183 0417 8511

Factory Tel: 0417-2267160

E-Mail: 113329659@qq.com
xygs66888@163.com

Xiyuan