How Prefabricated Pump Stations Are Installed

Prefabricated pump stations have a small footprint, cause no pollution, last a long time and do not need constant attendance. They are engineered units that provide hydraulic and pneumatic power and use this pressure to convey liquids (mainly water). Integrated prefabricated pump stations are used more and more widely. They can handle domestic sewage from new residential communities or from renovated and expanded residential buildings, office buildings, hotels, restaurants and other public buildings, and are installed underground outdoors.

Before installing an integrated prefabricated pump station, a station plan must be drawn up and an on-site geological survey carried out, producing a written report that clarifies how the ground will change after the pit is excavated, to avoid bank collapse. A dedicated construction plan is prepared according to the site's geology and design requirements. Before casting the concrete base slab, make sure the bottom of the pit is level and lay a 10 cm layer of crushed stone. Once it is confirmed that the station will be lifted into place, prepare a dedicated lifting plan for the shaft; for larger stations where lifting work is more hazardous, the plan must also be reviewed to ensure a safe lift. Before the station is lowered into position, clean the surface of the concrete slab with a brush to make sure there is no soil or debris between the mounting surface and the station base. Lifting must follow the operating requirements in the manual: lift the shaft vertically, secure the anchor bolts, make sure the hook is evenly loaded, and use lifting slings and ropes to avoid crushing the station and its cover. The inlet and outlet of the shaft must line up with the inlet and outlet pipes, and flexible joints must be fitted at the pipe connections. Use rail transport or mechanical excavation wherever possible, mark routes on drawings and on site, and follow machinery operating rules to keep people safe. Leave a safe clearance around the pump pit for future equipment maintenance. All work must be carried out by experienced professionals.

Back

Product Categories

Contact Us

Address: Liujin Road, Sitaizi Industrial Park, Bayuquan District, Yingkou, Liaoning, China

Contact: Mr. Li Chuanyi +86 138 4076 5457

Technical Service: Mr. Song (Engineer) +86 183 0417 8511

Factory Tel: 0417-2267160

E-Mail: 113329659@qq.com
xygs66888@163.com

Xiyuan