How to Choose a Sewage Lift Pump Station to Solve Basement Drainage Problems

How to Choose a Sewage Lift Pump Station to Solve Basement Drainage Problems

  Having discussed at length the advantages of using sewage lift pump stations for basement drainage, today let's look at real cases to see how sewage lifters demonstrate these advantages in practice.

  Case 1: Basement bathroom drainage

  The basement has just one bathroom that needs drainage, with a toilet, a shower and a washbasin. The sewage lifter is placed directly behind the rear-outlet toilet, with the washbasin and shower drains connected on either side. The shower needs to be raised by 20 cm so that its water flows into the sewage lifter by gravity, and so that water does not back up due to sloshing when the unit starts pumping.

 Case 2: Basement kitchen drainage

  The kitchen is located in the basement, and a vegetable sink and a water purifier need drainage. Since the kitchen occasionally discharges hot wastewater, the unit must withstand short periods of high temperature, and its large pendulum float design effectively resists interference from grease. If the kitchen uses a lot of oil, a grease separator can be installed as in this case, effectively extending the unit's service life.

Case 3: Drainage for two bathrooms, a bar counter and a separate washbasin in the basement

  The basement has relatively many water outlets spread across different spaces. To handle them all with one sewage lifter, a larger unit is needed: a 55 L capacity holds more sewage and reduces the number of starts, which helps with maintenance. When installing this kind of unit, plan the plumbing and electrical positions in advance; for in-pit installation, reserve a 60 × 80 cm pit to make later installation easier.
 Case 4: Drainage for two bathrooms, a kitchen, a bar counter and a tea room in the basement

  In the basement of a very large villa with many outlets and relatively frequent use, a dual-pump duty/standby system is used; when necessary, both pumps can run simultaneously to handle sudden high flows, giving high stability. A separate controller with an LCD screen allows adjustment of start/stop levels and alarm levels and shows the unit's maintenance schedule, among other things.
 These four cases are typical basement drainage arrangements, where the drainage points are below the municipal network and a sewage lifter is needed to lift the water from below up to the main sewer at roughly ground-floor level. Next time we can look at typical cases of same-floor drainage.

Back

Product Categories

Contact Us

Address: Liujin Road, Sitaizi Industrial Park, Bayuquan District, Yingkou, Liaoning, China

Contact: Mr. Li Chuanyi +86 138 4076 5457

Technical Service: Mr. Song (Engineer) +86 183 0417 8511

Factory Tel: 0417-2267160

E-Mail: 113329659@qq.com
xygs66888@163.com

Xiyuan